OUR PROJECTS
Leightons – Channel Island Power Station – Gas Turbine Units 8 & 9 Construction Piping
Workshop fabrication and site installation of fuel gas feed lines and piping supports, valves, turbines, pumps, compressors and gas coalescer from APA yard into Channel Island Turbines, approximately 1200m. 300nb low temp carbon and 100nb 316L Stainless steel. 100% Visual, 100% Radiography 100% Magnetic Particle, 100% Dye Penetrant and flange management.
MacMahons – RAAF Base Darwin
Workshop fabrication and site installation of 3.5km of underground 200nb 316 stainless piping and spooling, pumps, valves, pits, fuel filtering systems, pipe supports and platforms. Tank installation. Hydrostatic Testing. NDT 100% Visual Inspection and 100% Radiography. Passivation and full MDR.
PTTEP – Montara
Workshop fabrication of piping, pipe spools, supports, walkways, vessels, turbines, valves, pumps and steelwork. Engine room installation. Flange management. NDT. Hydrostatic Testing. Surface treatment. Offshore installation. Shut Downs.
ConocoPhillips – Bayu Undan and DLNG
Workshop fabrication of piping, pipe spools, supports, walkways, vessels, turbines, valves, pumps and steelwork. Engine room installation. Flange management. NDT. Hydrostatic Testing. Surface treatment. Offshore installation. Shut Downs.
APA Group – Amadeus Gas Pipeline – Bi Directional Pigging Modifications
Workshop Fabrication of numerous pipe spools ranging in size from 25nb to 350nb, pipe supports, valves, receivers and launchers for the Amadeus Gas Pipeline. Included supply of materials, NDT 100% Visual Inspection, 100% Radiography and 100% Magnetic Particle, Hydrostatic testing, Surface Coating, flange management, packaging and full MDR. Site Installation along the Amadeus Gas pipeline from Ban Ban Springs to Palm Valley (eleven stations)
The Expro Group
Fabrication of flow lines and test equipment spooling.
Bluewater Australia – Glas Dowr
Workshop fabrication of piping, pipe spools, supports, walkways, vessels, turbines, valves, pumps and steelwork. Engine room installation. Flange management. NDT. Hydrostatic Testing. Surface treatment. Offshore installation. Shut Downs.
Territoria Civil – Vopak Fuel Farm Upgrade
Workshop fabrication and site installation of piping and pipe spooling ranging in size from 15nb to 400nb pipe, valves, pumps, supports, platforms and walkways. Tank alignment and installation. Supply of materials. NDT 100% Visual Inspection, 10% Radiography and 100% Magnetic Particle. Hydrostatic Testing, Surface coating, packaging and full MDR.
MacMahons – Darwin Marine Supple Base
Workshop fabrication and site installation of underground fuel pipeline, 200nb standard weight, pipe supports, valves and fuel filtering system pumps. NDT 100% Visual Inspection, 100% Radiography and 100% Magnetic Particle. Flange management. Supply of labour, plant, material and consumables.
BMD Constructions – Ludmilla Waste Water Treatment Plant Upgrade – Stage 2
Workshop fabrication and site installation of pipe work, pipe supports, pumps and valves. Supply of materials. Flange management. NDT – 100% Visual, 10% Radiography. Hydrostatic Testing, Passivation. Packaging, Delivery, MDR.
APA Group – Katherine Gas Meter Station Upgrade
Workshop fabrication and site installation of tee spool and tie in spool piece above group pipe work, supports, skids and valves. Supply of materials. Flange management. NDT – 100% Visual, 100% Radiographic, 100% Magnetic Particle. Hydrostatic Testing 7,700 kPa. Surface Treatment. Delivery to Katherine. MDR.